Policy and Procedures For Use Of G.C.U.A.
Septage
Handing Facility
Waste haulers
who wish to dispose of waste products into the GCUA septage facilities
must adhere to the following policy and procedures:
1. Every waste hauler and/or customer who wishes to use or continue
to use the GCUA septage handling facility will be provided with
a copy of Chapter
15 of the Authority's Pretreatment Rules and Regulations
and will be required to sign and submit to the GCUA an Appendix
G, Billing and Fleet Information/Acknowledgment Form acknowledging
that he/she has read and understands the rules, regulations and procedures
of the GCUA
2. Each vehicle (whether a trailer, cab, container, or single-unit
vehicle) that will use the GCUA facility must be listed on the form
and the form returned to the GCUA. Each vehicle listed by the hauler
will be issued a GCUA decal. GCUA decals will only be issued to those
vehicles that have a current N.J. Department of Environmental Protection
(N.J.D.E.P.) decal. The fee for each decal is $5.00. All vehicles
will be required to have the GCUA decal displayed in order to continue
using the GCUA septage facility. Haulers are encouraged to purchase
GCUA decals for their entire fleet at one time.
3. Hauler Certification Forms will be provided by the GCUA and can
be obtained at the Authority's business office Monday through Friday,
from 9:00 a.m. to 4:00 p.m. In order to ensure proper billing, the following
procedures must be followed:
a) Correct forms must be used for each load.
b) Each form must be filled out COMPLETELY, including account/decal
number, which should be indicated in the upper right-hand corner of the
form.
c) Loads CANNOT be mixed.
d) Forms must show type of waste being delivered. Failure to indicate
the type of waste or designating more than one type of waste on a hauler
form will result in the entire load being billed at the highest rate.
e) Haulers must also submit to the GCUA an IRS
Form W-9, Request for Taxpayer Identification Number and Certification.
4. Truck Capacities : All customers will be billed
on the rated gallon capacity of the container. This volume is identified
on the container as part of its N.J.D.E.P. registration. GCUA may
require additional certifications as to the rated volume of the tank
truck or container. A hauler may opt to be billed on a weight basis
(converted to gallons using a conversion factor of 8.34 pounds per
gallon).
5. Grease Facility: GCUA's grease facility will
accept grease from any location. Restaurant grease and grease from wastewater
treatment plants do not need prior approval, however, grease from an
industry of any sort requires a sample and analysis delivered to the
GCUA for determination of acceptability. It is a violation of GCUA
Rules and Regulations to mix grease and septage in the same load.
6. Billing: All customers will be billed in the first
week of every month for the previous month's discharges. The bills will
reflect the type of gallonage and breakdown of charges for each gallonage.
Any payments received in that month will also be reflected.
7. Interest : Any bills that remain unpaid after the
15th of the following month will be charged interest back to the date
of the billing. Interest is charged on a daily basis at a rate of 18%
per annum.
8. Non-Payment : If payment is not received by the
15th of the following month, use of the facility will be terminated until
payment is made in full. The GCUA reserves the right to make the
determination which would prohibit a hauler from using GCUA's facility
on a permanent basis.
9. Hours : Operating hours for the septage receiving
facility are as follows:
Monday-Friday 5:00 am - 9:00 pm
Saturday 7:00 am - 3:00 pm
Sunday By appointment only
10. Speed Limit : The GCUA has a long-standing
and enforceable speed limit of 10 miles per hour at the facility. Any
driver not adhering to GCUA policy on road speed will be prohibited
from using the facility in the future.
11. Driver Sign-In : All drivers are required to
sign-in at the septage building each time a load is delivered to
the facility.